A granny flat on a rural or lifestyle block needs more checking than its floor area alone might suggest. The zone, overlays, wastewater arrangements, access and site conditions can all affect what is practical and which approvals you need to confirm.

Start with the zone, not just the size

The planning rules for small second dwellings apply across residential and rural zones, but that does not mean every rural block follows the same permit pathway. In some zones, or under particular zone schedules, a planning permit may be required even when the dwelling is well below the floor-area limit.

The small second dwelling provisions, including Amendment VC306 set out what decides whether a planning permit is needed, and it is not the size alone. Some rural zones carry conditions that have to be met: services such as an all-weather road for emergency vehicles, wastewater, potable water with firefighting storage and electricity. They can also carry setback triggers from waterbodies, roads, other dwellings and particular land uses. Where those conditions or setbacks cannot be met, a planning permit is required, and in practice that is common on rural blocks. In the Rural Conservation Zone, for example, a permit is often needed because an Environmental Significance Overlay applies across the land rather than because of the zone itself. A permit may also be required under another part of the planning scheme, and a rural zone can require one for earthworks.

The lot size can matter too: a permit is normally required if a residential-zone lot is less than 300 square metres. Before settling on a design, check the planning scheme map or VicPlan to identify the zone and any schedule that applies. Then ask the relevant council to confirm what that means for your property. Do not assume that being under the floor-area limit settles the planning question.

Amendment VC306 took effect on 15 October 2026 and increased the maximum floor area from 60 to 80 square metres. The building definition moved to 80 square metres as well, through regulations that commenced on 27 October 2026. If you have heard the old 60-square-metre figure, it has changed, and it is worth knowing that some published material, including government material, still shows the old figure. For your particular lot, confirm the building permit and siting assessment with the relevant building surveyor.

Overlays can change the design response

A planning overlay can add another layer of requirements, and a planning permit may be needed under an overlay even when one would not normally be required under the zone. An overlay may also specify other requirements.

On a rural or lifestyle block, check whether bushfire, land management, environmental significance or erosion overlays apply. These can influence the design response, so it is useful to identify them before you settle on where the dwelling will sit or how it will be shaped. Ask the relevant council what applies to the land and what the design needs to address.

Also check for a section 173 agreement or registered restrictive covenant on the title. Either may affect what can be built, including the size, materials or outbuildings. State and local government do not create or enforce restrictive covenants, so check the title documents and get the right advice if their effect is unclear.

Water, wastewater and access outside town

On a rural block, a connection to town sewer is usually not available. That makes the wastewater system and where it can sit on the property part of the design conversation, as well as a planning question. Council is the authority on wastewater requirements, so confirm these for your block rather than relying on what works elsewhere.

Water supply belongs in the same conversation. Consider how the dwelling will receive water, where tanks may fit and what firefighting water arrangements need to be checked. The answers can affect where the building and other site elements can sensibly go.

Access also matters. Look at the driveway grade, the turn into the site and whether fire vehicles can access the proposed location. On a sloping block, the amount of cut and fill needed to make a building pad can affect whether the layout works as intended. These are good questions to raise while you are comparing possible locations.

Check power and other services before drawings are finalised. The distance from the connection point, and whether a new pit or trenching is needed, may influence where services can run. If there are trees or vegetation near a possible building area, identify them early. In certain circumstances, removing, destroying or lopping a canopy tree may need a planning permit under clause 52.37.

What the 80-square-metre definition measures

A small second dwelling is a building, or part of a building, with a total floor area not exceeding 80 square metres. It must be on the same lot as an existing dwelling and used as a self-contained residence. That means it needs a kitchen sink, food preparation facilities, a bath or shower, a toilet and a wash basin.

Floor area is measured from the outside surface of the external walls, or from the centre of a party wall. An attached or adjoining unroofed patio, pergola, porch, terrace or other unroofed structure is excluded. So are attached or adjoining roofed decks, verandahs and other roofed structures.

That definition gives you a useful starting point, but it does not answer every design or approval question. A building permit is normally required to develop a small second dwelling, including where a planning permit is also needed. The National Construction Code’s Livable Housing Design Standard also applies alongside siting and design requirements, and some of its requirements need to be considered at design stage.

In most cases, the relevant building surveyor assesses siting as part of the building permit. If a planning permit is required because a residential-zone lot is under 300 square metres, the council planning department carries out the siting assessment. The planning and building systems use the same siting requirements, so they are assessed once. Confirm the process for your lot with council and the building surveyor.

Two requirements that do not apply to a small second dwelling are worth knowing as well. Car parking does not need to be provided for it, and it is exempt from a development infrastructure levy or community infrastructure levy under a development contributions plan.

A granny flat is not a subdivision

A small second dwelling stays on the same lot as the existing dwelling. A planning permit cannot be granted to create a separate lot for land containing a small second dwelling. In other words, a granny flat is not a subdivision and does not create a second title.

If your aim is to create a separately titled property, that is a different question to take up with the relevant council. It is worth being clear about your goal early, so you can check the right pathway before committing to a design.

What to gather before you call a builder

You do not need to resolve every planning or building question before making an enquiry. It is helpful, though, to have a clear picture of the property and what you want the second dwelling to do.

Start with the address or location, what you know about the zone and overlays, and where the existing house, driveway and services are. Note any slopes, trees, water or wastewater arrangements, and title restrictions you are aware of. A simple sketch showing possible locations can also make the first conversation more useful.

Think about who will use the dwelling and what it needs to include for everyday living. A place for a parent may call for a different layout from accommodation for adult children or guests. You can also consider whether an extension to the main home may better suit your plans. If you are exploring that option, read about home extensions in Kyneton.

Common questions

Does a dwelling under 80 square metres automatically avoid a planning permit?

No. The zone, its schedule, overlays and other planning scheme provisions can still mean a permit is needed. Ask the relevant council to confirm the requirements for your property.

Do I need a building permit if a planning permit is required?

A building permit is normally required to develop a small second dwelling, including when a planning permit is required. Confirm the siting and building permit requirements with the relevant building surveyor.

Is a small second dwelling allowed to have a separate title?

No. A planning permit cannot create a separate lot for land containing a small second dwelling. If a second title is your objective, subdivision is a separate matter to discuss with council.

Will a rural block need a separate wastewater system?

It depends on the property and the available services. Where town sewer is not available, wastewater arrangements and the proposed system location need to be checked with council.

Do I need to check trees before choosing a location?

Yes. Find out whether a canopy tree or other vegetation affects the proposed building area. In certain circumstances, a permit may be required to remove, destroy or lop a canopy tree under clause 52.37.

How BOS Construction works

  1. Initial enquiry. Brad answers directly to discuss plans and location.
  2. Site visit. Brad inspects existing conditions, levels, access and structural constraints.
  3. Scope. The work is set out in writing before anything starts.
  4. Construction. Brad is on site and on the tools as the single point of contact.
  5. Handover. A final walkthrough to address any outstanding items.

Talk through your block and plans

A useful first conversation can help you identify which questions need answers from council or a building surveyor, and whether the proposed location looks workable. BOS Construction works around Kyneton, Maldon, Woodend, Heathcote, Castlemaine and the wider Calder corridor. You can read about our building work in Castlemaine and our Bendigo building services.

BOS Construction is a Master Builders Victoria member and registered building practitioner, BPC DB-U 38574, with 20 years’ experience. Owner and builder Brad O’Shea is on site and on the tools himself. To discuss your plans, call 0425 808 840 or email info@bosconstruction.com.au.